At proper intervals waste-gates should be arranged so as to discharge the water when necessary, without risk of damage to the ditch. In regions of heavy snow, these wasteways should be provided at intervals not greater than onehalf a mile. A Textbook on Mining Engineering - Σελίδα 67 1900 Πλήρης προβολή -
|