" The tops of all piles shall be cut off below the lowest water line. When required, concrete shall be rammed down in the interspaces between the heads of the piles to a depth and thickness of not less than twelve inches and for one foot in width outside... "
Inspection of the Materials and Workmanship Employed in Construction: A ... - Σελίδα 223
των Austin Thomas Byrne - 1910
Πλήρης προβολή - Σχετικά με αυτό το βιβλίο

Skeleton Construction in Buildings: With Numerous Practical Illustrations of ...

William Harvey Birkmire - 1893 - 284 σελίδες
...a load exceeding 40,000 pounds. The tops of all piles shall be cut off below the lowest water-line. When required, concrete shall be rammed down in the...inches and for 1 foot in width outside of the piles. " When ranging and capping timbers are laid on piles for foundations they shall be of hardwood, not...

Proposed Building Law for Medium Sized Cities: As Drafted by a Commission ...

New York (State). - 1893 - 68 σελίδες
...pile shall be weighted with a load exceeding forty thousand pounds. The tops of all piles shall be cut off below the lowest water line. When required,...the piles to a depth and thickness of not less than twelve inches and for one foot in width outside of the piles. Where ranging and capping timbers are...

Laws of the State of New York, Τόμος 1

New York (State) - 1894 - 1188 σελίδες
...pile shall be weighted with a load exceeding thirty thousand pounds. The tops of all piles shall be cut off below the lowest water line. When required...concrete shall be rammed down in the interspaces between tine heads of the piles to a depth and thickness of not less than twelve inches Uto^j* and for one...

The Greater New York Charter as Enacted in 1897: With Notes Indicating the ...

New York (N.Y.), Mark Ash - 1897 - 1420 σελίδες
...pile shall be weighted with a load exceeding forty thousand pounds. The tops of all piles shall be cut off below the lowest water line. When required,...the piles to a depth and thickness of not less than twelve inches and for one foot in width outside of the piles. Where ranging and capping timbers are...

Building Construction and Superintendence, Μέρος 1

Frank Eugene Kidder - 1897 - 444 σελίδες
...bearing. " No pile shall be weighted with a load exceeding 40,000 pounds. "The tops of all piles shall be cut off below the lowest water line. When required,...in the interspaces between the heads of the piles In a depth and thickness of not less than 12 inches and for I foot in width outside of the piles."...

The Building Code of the City of New York

New York (N.Y.) - 1901 - 186 σελίδες
...will be driven, that he may be present in person or by representative. The tops of all piles shall be cut off below the lowest water line. When required,...the piles to a depth and thickness of not less than twelve inches and for one foot in width outside of the piles. Where ranging and capping timbers are...

Building-law of the Town of Brookline, Adopted March 31, 1903, Approved by ...

Brookline (Mass.). - 1903 - 142 σελίδες
...will be driven, that he may be present in person or by representative. The tops of all piles shall be cut off below the lowest water line. When required,...the piles to a depth and thickness of not less than twelve inches and for one foot in width outside of the piles. When ranging and capping timbers are...

The General Ordinances of the City of Portland

Portland (Or.) - 1905 - 688 σελίδες
...driven, that they may be present in person or by representative. The tops of all the piles shall be cut off below the lowest water line. When required, concrete shall be rammed down in the spaces between the'' heads of the piles to a depth and thickness of not less than twelve (12) inches,...

Municipal Ordinances of the City of Troy: Rules and Regulations of the ...

1905 - 468 σελίδες
...bureau shall be notified of the time when test piles will be driven. The tops of all piles shall be cut off below the lowest water line. When required, concrete shall be rammed down in the interspace between the heads of the piles to a depth and thickness of not less than twelve inches and...

Building Ordinance, Adopted March 20, 1905: Amended March 1, 1906 - June 18 ...

Troy (N.Y.). - 1906 - 72 σελίδες
...Bureau shall be notified of the time when test piles will be driven. The tops of all piles shall be cut off below the lowest water line. When required concrete shall be rammed down in the interspace between the heads of the piles to a depth and thickness of not less than twelve inches and...