of moments of inertia, 266 of number of rails, pairs of angle bars, and bolts per mile of track, 236 of number of ties per mile of track, 237 of number of track bolts in a keg, 237 of quantities of ingredients for concrete, 316 of radii and deflections, 160 of railroad spikes per mile of track, 237 of relations among the functions of an angle, 23 of requirements for highgrade cements, 308 of rolling friction for different roadway surfaces, 274 of safe loads on earth subfoundations, 333 of shearing and bearing values of rivets, 282 Table of shrinkage of earthwork, 217 of spaces between ends. of specific gravities, 347 of superelevation of outer of tensile strength of cement of time of upper culmination of Polaris, 141 of ultimate resistance of chain cables, 303 of ultimate strength of concrete, 318 of ultimate strengths of metals, 276 of ultimate strengths of of velocity and discharge of weight and strength of of weight of rails required per mile of track, 236 of weights and dimensions of standard rails, 235 Tables for special constants for reinforced-concrete beams, 326, 327 for transition spirals, 180 to Metric conversion, 6 of properties of reinforced- of weights and measures, 1 to 8 Stadia reduction, 99 to 106 મ Tangent deflection, 165 deflection, Application of chord and, 166 distance, 162 distance of transition spiral, 178 Point of, 162 Telford's system of macadam roads, 398 Temperature, Corrections for, 131 stress, 286 Tensile stress, 275 Three-arm protractor, 127 13 -level ground, Field notes for, 205 -level sections in earthwork, 202 -point problem in planetable survey, 110 Throw of a railroad switch, Ties per mile of track, Table To change local into stand- Toe of a railroad switch, 240 Laying out a curve with, method of topographic sur- surveying, Special problems Surveyor's, 39 Transition spiral, Definition of, 172 Transition spiral field work, 179 spiral, Tangent distance of, 178 spirals, Tables of, 180 to 189 Trapezium, 11 Trapezoid, 11 Trapezoidal rule for finding area, 12 Traverse, Definition of, 51 Adjustment of measured Triangles, Formulas for solution of oblique, 25 Formulas for solution of right, 24 Trigonometric formulas, 20 leveling, Problems in, 90 Turning point in leveling, Turnout dimensions for point from the outer side of Table of dimensions of stub switch, 244 to the inner side of curved track, 248 Two-point problem in planetable survey, 110 .Tp. 36 square miles (6 mi. square). = 1 township . sq. mi. A. sq. ch. sq. rd. 1=640=6,400 102,400 sq. li. 64,000,000 The acre contains 4,840 sq. yd., or 43,560 sq. ft., and is equal to the area of a square measuring 208.71 ft. on a side. Other terms are the pole or perch (P.), which is equal to 1 sq. rd. and the rood (R.), which is equal to 40 sq. rd. |